Battery storage projects for investors. Powered sites for data centers.

For investors

Battery storage
projects in Poland

01

Sourcing

We screen medium-voltage projects from early development to ready to build.

02

DD support

We coordinate technical and legal due diligence with independent advisers.

03

Project introductions

We introduce investors to screened battery storage projects.

04

EPC management

We coordinate EPC contractor selection and manage construction through commercial operation.

The projects belong to their developers. 8Blocks does not own them.

The market

Why timing matters

397vs66

Of 397 battery projects with connection conditions, 66 had signed agreements as of April 2026 (Modo Energy).

1 year

New connection conditions now expire after 1 year, down from 2 (Garrigues).

24 months

Time to notify the grid operator of a final building permit after signing the connection agreement (Garrigues).

For developers and operators

Data center
sites in Poland

Europe
Poland
01

Site selection

We identify sites with grid access.

02

Grid connection

We review import capacity and connection status.

03

DD management

We coordinate land and permitting reviews.

04

EPC

We deliver the energy infrastructure for the site.

Good to know

Short answers

What does “ready to build” mean in Poland?

Typically: a signed grid connection agreement, land rights, zoning, a final building permit and any required environmental decision.

What changed with the 2026 Grid Act?

Since 30 April 2026, new connection conditions are valid for one year instead of two, the advance payment doubled to PLN 60 per kW, and storage projects must notify the grid operator of a final building permit within 24 months of the connection agreement (Garrigues).

How does battery storage earn in Poland?

Three ways: the capacity market (the auction for 2030 closed at PLN 465.02 per kW per year, URE), reserve markets (FCR, aFRR, mFRR, PSE) and price spreads.

What do you check before presenting a project?

Grid status and dates, cable route rights, land title, the building permit, noise and fire studies, and any capacity market contract.

What matters most for a data center site?

Power. By May 2026 PSE had issued connection conditions to data center projects but had signed no connection agreement (PAIH). We look at import capacity, voltage level, connection status and land.

Does 8Blocks own the battery projects?

No. The developers own the projects.

Is 8Blocks an EPC contractor for batteries?

No. We provide EPC management, not construction. For data center sites we deliver EPC.

How do we start?

Tell us your project criteria through our contact page.